Work Package

From PRINCE2 Agile wiki
Jump to: navigation, search

Tailoring

Work Package(s) define the releases, and iterations (Sprints in Scrum) that are contained in the stage. The content of Work Packages will be broken down or transformed into the lower level plans such as release plans and iteration plans, that are usually in the form of backlogs.

The structure and use of a Work Package is the same as the original Work Packages in PRINCE2. A few things worth mentioning are:

  • Some generic information about the releases and iterations related to the Work Package should be defined there.
  • The scope is expected to be flexible, and therefore, a much higher tolerance is expected for it (we don't want to have exceptions raised because of deviations in scope; they are just normal).
  • Checkpoint Reports are probably low-tech, informal, and pull-based, and this should be explained in the Work Package.

This is also a guide from the table 10.1 of the original PRINCE2 manual (2009): The scope of a plan is defined by the set of products to be delivered. Scope tolerance (if used) should be in the form of a note on or reference to the product breakdown structure for the plan. Scope tolerance at the stage or Work Package level is of particular use if applying a time-bound iterative development method such as Agile.

Process Model

PRINCE2 Agile Process Model state25.png

Legend:

Notes:

  • The above image assumes that Scrum is used in the delivery level, which is not necessary.
  • The number of stages, releases, and Sprints are just examples, as well as the exception in the third stage.
  • The diagram is schematic and many details are not shown.